Rakvere ORC CHP stage I

Rakvere ORC CHP stage I

Electrical works in the Rakvere 5.6 MW ORC combined heat and power cogeneration plant fuelled by woodchips — stage I (Adven Eesti AS)

Address: Päikese street 4, Rakvere, Lääne-Viru county, Estonia

Customer: Adven Eesti AS

Works:

  • Delivery and installation of electrical and automation equipment
  • Construction of 10,5 kV connection point for connection with distribution grid EE Elektrilevi
  • Medium voltage, low voltage and automation installation works
  • Writing and setting up the logic program for process automation of the cogeneration plant
  • Visualisation and creating of remote monitoring (SCADA)
  • Installation of emergency generator set and construction of emergency feeding system

Смотрите другие проекты

Назад